Skip header

Supplier Opportunities for Dogger Bank Wind Farm

As part of the development of Dogger Bank Wind Farm and Equinor locating to Tyne Dock Enterprise Park, the Dogger Bank Wind Farm partnership (SSE Renewables and Equinor) and its appointed Tier 1 Contractors are committed to supporting the development and growth of a competitive UK supply chain.

Dogger Bank Wind Farm is holding a series of free supply chain webinars for the development, organised by NOF Energy.  The webinars will focus on introducing the Dogger Bank Wind Farm development and the Tier 1 Contractors and will showcase the opportunities the project offers with a particular focus on Tier 2 contracts.  Following each webinar 1-2-1 meetings will be held, potential suppliers must register an interest for these meetings when registering for the webinar, the tier one suppliers will then select who they will meet from those who come forward.

Please see below a summary of the Tier 1 suppliers, their tier 2 supply chain requirements and webinar details. 

Supplier name: Jan De Nul Group
Services provided: Transport and installation of offshore wind turbines
Tier 2 Supply Chain Requirements:

  • Agency services
  • Freight forwarding & custom handling
  • Vessel catering
  • Fuel
  • Steel fabrication (grillage)

Supply chain event details:
Tuesday 15 September 2020, 11am - 12 noon
Book here: https://www.eventbrite.co.uk/e/dogger-bank-wind-farm-tier-1-contractor-webinar-jan-de-nul-tickets-115469633783
 

Supplier name: OHT (Offshore Heavy Transport)
Services provided: Transport and installation of foundations
Tier 2 Supply Chain Requirements:
From tools connected to the crane to onshore logistics. See booking page for full list of supplier opportunities.
Supply chain event details:

Wednesday 16 September 2020, 11am - 12 noon
Book here: https://www.eventbrite.co.uk/e/dogger-bank-wind-farm-tier-1-contractor-webinar-oht-tickets-115470109205
 

Supplier name: DEME
Services provided:
Inter-array cables (supply, install and protect)
Tier 2 Supply Chain Requirements:

  • Port Services
  • Helicopter Services (long way from shore and we may need urgent transfers etc)
  • Shipping Agents
  • Plant Hire
  • Welding Services

Supply chain event details:
Thursday 17 September 2020, 2pm - 3pm
Book here: https://www.eventbrite.co.uk/e/dogger-bank-wind-farm-tier-1-contractor-webinar-deme-offshore-tickets-117518971407


Supplier name: Jones Bros (Civil Engineering UK)
Services provided: Installation of onshore cable infrastructure
Tier 2 Supply Chain Requirements:

  • Security fencing
  • Space within the docks

Supply chain event details:
Friday 18 September 2020, 11am - 12 noon
Book here: https://www.eventbrite.co.uk/e/dogger-bank-wind-farm-tier-1-contractor-webinar-jones-bros-tickets-115469705999


Supplier name: ABB
Services provided: HVDC converter systems
Tier 2 Supply Chain Requirements:

  • Building Outfitting Company who can undertake all of the following trades (Dry Walling /Plastering / Plumbing / Joinery / Painting / False Ceilings / Floor Covering)
  • Firestopping Installation Specialist
  • On Site / Mobile Catering
  • On Site Office Cleaning Services
  • Fuel Deliveries
  • Water Deliveries
  • Waste Recycling Services
  • Septic Tank disposal
  • Road Cleaning Services
  • Local Accommodation (Hotel/B&B/Long term lets)
  • Serviced Office Accommodation

Supply chain event details:
Monday 21 September 2020, 2pm - 3pm
Book here: https://www.eventbrite.co.uk/e/dogger-bank-wind-farm-tier-1-contractor-webinar-abb-tickets-115469262673


Supplier name: GE
Services provided: Turbines
Tier 2 Supply Chain Requirements:

  • Nacelle Components
  • Installation & Commissioning
  • Operations and Maintenance
  • R&D

Supply chain event details:
Tuesday 22 September 2020, 2pm - 3pm
Book here: https://www.eventbrite.co.uk/e/dogger-bank-wind-farm-tier-1-contractor-webinar-ge-renewables-tickets-115469523453


Supplier name: NKT
Services provided: Manufacture, supply and installation of offshore export power cables and onshore export power cables
Tier 2 Supply Chain Requirements:

  • Temporary welfare and offices of fuels and oils
  • Waste management (skips)
  • Security
  • Small cleaning companies (for site office and welfare facilities)
  • General Civil and Building merchants
  • Plant hire, lighting towers/generators/lifting equipment
  • HIAB (lorry mounted crane) hire
  • Water supply bulk tankers

Supply chain event details:
Wednesday 23 September 2020, 11am - 12 noon
Book here: https://www.eventbrite.co.uk/e/dogger-bank-wind-farm-tier-1-contractor-webinar-nkt-tickets-117519270301


Supplier name: Aibel
Services provided: HVDC offshore convertor platforms
Tier 2 Supply Chain Requirements:

  • Bulk products e.g. structural steel, piping, HVAC ducting, cables, painting++
  • Equipment products e.g. sea water cooling skid, sea water pumps, HVAC units, Hypoclorithe skid, offshore cranes, emergency equipment, pull-in winch (for cables), electro equipment.
  • Services of interest
  • Scour protection design + model test
  • Safety analysis
  • 3rd party certification

Supply chain event details:
Thursday 24 September 2020, 2pm - 3pm
Book here: https://www.eventbrite.co.uk/e/dogger-bank-wind-farm-tier-1-contractor-webinar-aibel-tickets-115469391057


Supplier name: SAIPEM
Services provided: Transportation and installation of two offshore HVDC platforms
Tier 2 Supply Chain Requirements:

  • Grouting Services for Piles
  • Supply of Miscellaneous steel for S7000 Fabrication / Steel for Installation Aids fab. / Temporaries & shimming steel & grillage HEB / Grillage and Seafastening / Spreader Bars pup pieces, division plates, additional cowhorns
  • Supply of Rigging <1000 ton capacity
  • Modification of Spreader Bars - Topsides and Jackets (Services include: fabrication & NDT & certification)
  • Scaffolding and Rope Access Services
  • NDT Services
  • Quayside Plywood
  • Grating
  • Welding Gases
  • Timber chocks for piles grillage
  • Stern Bridle Equipment - Hiring of Winches
  • Stern Bridle Equipment - Hiring of Compressors

Supply chain event details:
Friday 25 September 2020, 2pm - 3pm
Book here: https://www.eventbrite.co.uk/e/dogger-bank-wind-farm-tier-1-contractor-webinar-saipem-tickets-117518714639